Taking over a project already in motion
In Attendorn, Dela Networks took over an FTTH rollout that was already under construction. The handover from the previous contractor meant that the first priority was not simply to add production capacity, but to establish a reliable picture of the project’s actual position.
Open interfaces, remaining work, delivery priorities and responsibilities had to be clarified before the teams could move forward under one coordinated structure.
A structured full-turnkey setup
Dela Networks assumed responsibility for the agreed full-turnkey scope and brought planning, field execution, installation, quality control and documentation into one delivery framework.
This created defined points of contact, clearer reporting and a practical basis for continuing work without treating the project as a restart from zero.
Partial scope delivered
Within the scope delivered by Dela Networks, the teams completed more than 2,900 metres of network and hundreds of connections. These figures describe Dela Networks’ delivered part of the project rather than the original total rollout scope.
The work included active field delivery and technical installation across the network, from fibre blowing and distribution cabinets to preparation of customer connections.
Recovery is about control and continuity
Project takeover and recovery is not only about deploying new crews. It is about understanding what has already been done, identifying what remains open and creating a structure in which decisions, execution and documentation stay connected.
Attendorn demonstrates how Dela Networks can enter a running rollout, take responsibility for an agreed scope and move delivery forward with clearer ownership and operational discipline.
Need support with a delayed or fragmented rollout? Explore Project Takeover and Recovery or start a discussion with our team.